Investigating Causes of Delay and Cost Overrun in the Construction of Industrial Buildings Using the Lean Approach and the Hybrid Simulation Model in Tabriz
Defended At:
19 September 2022
Defend Location:
Faculty of Architecture and Urban Planning, National Garden Campus of the University of Art
Degree:
MS.
Role:
Supervisor